![]() |
Project Day! Whats on your list?
https://photos.smugmug.com/Orchid-sh...%5B1%5D-X3.jpg
got to get this stuff off the ground. Seeing more snails climb up into the pots!! going to move it all build some board shelves. get ready to move some larger plants down the back wall :) Whats on your honey dooo list :waving |
Quote:
|
My most important unfinished project is making a list of important unfinished projects.
|
I have the orchids set up so that summer is usually pretty easy and all I have to do is water and fertilize.
|
:chicken |
nice- i am making a wood fired hot tub in 15 minute increments.
i have about 30 plants that need some sort of care i am disassembling my hydroponic setup for more yard room collect, cut and freeze 198375 mangos |
https://photos.smugmug.com/Orchid-sh...%5B1%5D-X2.jpg
https://photos.smugmug.com/Orchid-sh...%5B1%5D-X2.jpg one days work, another starts :) |
1) i really like the wood over cinderblocks, that is asthetically pleasing, cheap and sturdy...nicely done
2) invest in some copper tape and go around the outside edge of all those platforms and the snail/slug issue will be almost all gone |
oh copper tape I will try that around my next construction of some tables.
one table is about rotted out and done, 10 years old, been moved a few times. Time to build a new one. :) The summer Shifty Shuffle is becoming an annual event!! |
I need to figure how to assemble the RO water system together, and research on the best way to set up my automatic mister around the green house.
|
All times are GMT -4. The time now is 06:25 AM. |
3.8.9
Search Engine Optimisation provided by
DragonByte SEO v2.0.37 (Lite) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.