Donate Now
and become
Forum Supporter.
Many perks! <...more...>
|
11-12-2009, 03:10 AM
|
|
OB Admin
|
|
Join Date: Jun 2005
Zone: 3a
Location: Edmonton, Alberta. Canada
Posts: 2,895
|
|
Quote:
Originally Posted by Sandy4453
This is going to be fantastic, what an ideal setup. How big is this room going to be? Please keep posting updates, this is very exciting!
|
It is 12' x 9' and 7'6" ceiling. I am pretty excited to finally get this project going.
Here is the framing done. Water lines are going in next. Hot and cold in the room and a line for an RO system.
|
11-17-2009, 09:59 PM
|
Senior Member
|
|
Join Date: Feb 2007
Zone: 8b
Location: SW Georgia
Posts: 1,321
|
|
Wow! what an undertaking. I know you will enjoy for years to come with some fantastic orchids. Keep up the pics. enjoy seeing your progress.
|
04-02-2010, 02:50 AM
|
|
OB Admin
|
|
Join Date: Jun 2005
Zone: 3a
Location: Edmonton, Alberta. Canada
Posts: 2,895
|
|
About time I got some updates on my project.
#1) The electrical is in. Multiple outlets all mounted high up on the wall to keep them from behind the benches and out of water's way.
#2) the exterior walls have been insulated with spray foam insulation.
#3) the insulation has been trimmed flush to the stud face.
|
04-02-2010, 07:00 AM
|
Senior Member
|
|
Join Date: Jul 2008
Zone: 8a
Location: West Midlands, UK
Age: 49
Posts: 25,462
|
|
Wow, what a project. Great that by redoing all this you can plan the orchid room from scratch and build in what you need as you go.
|
04-02-2010, 05:25 PM
|
|
OB Admin
|
|
Join Date: Jun 2005
Zone: 3a
Location: Edmonton, Alberta. Canada
Posts: 2,895
|
|
Quote:
Originally Posted by RosieC
Wow, what a project. Great that by redoing all this you can plan the orchid room from scratch and build in what you need as you go.
|
Hopefully I get it right! Still unsure what I am going to do for lighting.
Here are a few more pics from my progress.
#1) Moisture resistant drywall was used on all interior surfaces.
#2) All joints taped and mudded.
#3) More of the same.
#4) Used 2 recessed boxes in the room for water supply. Hot/cold for watering, cleaning etc and the smaller box is for an R/O system. Had the plumber run hot and cold to this one also - maybe I'll need both one day.
Last edited by Oscarman; 04-02-2010 at 05:31 PM..
|
04-04-2010, 05:24 PM
|
Senior Member
|
|
Join Date: Aug 2009
Zone: 5a
Location: MA, USA and Atenas Costa Rica
Posts: 1,508
|
|
I'm curious about the cost of your project. Boy would I like to be able to do something like that!
|
04-04-2010, 07:56 PM
|
Senior Member
|
|
Join Date: Jul 2009
Zone: 10b
Location: Hollywood, FL
Posts: 815
|
|
Oscarman, looks great. May I ask what are your plans for the other rooms? You might soon feel the need to expand further. I started with one pergola, built a second, and now planning a shade house and dry area. Current growing areas about 200 sq ft and future plans add another 300-500 sq ft. Additionally, both structures are 9' tall.
It never stops....trust me....NEVER!!!!
|
04-05-2010, 12:00 AM
|
|
OB Admin
|
|
Join Date: Jun 2005
Zone: 3a
Location: Edmonton, Alberta. Canada
Posts: 2,895
|
|
Quote:
Originally Posted by got ants
Oscarman, looks great. May I ask what are your plans for the other rooms? You might soon feel the need to expand further. I started with one pergola, built a second, and now planning a shade house and dry area. Current growing areas about 200 sq ft and future plans add another 300-500 sq ft. Additionally, both structures are 9' tall.
It never stops....trust me....NEVER!!!!
|
Sadly that will be the extent of the indoor growing area, in the remainder of the basement we have nice size family/theatre room, bedroom/massage therapy room, kids play room, storage/mechanical room, full bath, large laundry/work/potting room. I still have a large kitchen bay window and then I would have to move outside. If I could purchase and demolish the house behind me....then we are talking a real greenhouse!
Tell me about it never stopping - 5 plants in '85 and then before you know it 875! I am now much less of a madman and things are more under control.
|
04-05-2010, 01:03 AM
|
|
OB Admin
|
|
Join Date: Jun 2005
Zone: 3a
Location: Edmonton, Alberta. Canada
Posts: 2,895
|
|
Now I am almost caught up with picture posts vs stage of construction!
All surfaces in the room have been covered with FRP panels and all seam, joints and connections sealed with mildew resistant silicone. The goal is to have the room completely sealed from the rest of my home to avoid structural moisture & mold issues.
As you can see the rest of my basement reno is moving along also. Cabinets and linoleum in my workbench/potting area is in.
Last edited by Oscarman; 04-05-2010 at 01:05 AM..
|
04-06-2010, 05:42 PM
|
Senior Member
|
|
Join Date: Oct 2009
Zone: 8a
Location: Dallas, Texas
Age: 49
Posts: 235
|
|
This is going to be fantastic when it's all done. Thanks for the updates, and keep 'em coming!
|
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -4. The time now is 12:07 AM.
|