After a looong wait for the windows, which had to be custom made to retrofit the existing screen windows, the end is now in sight (and a good thing, as we have had unseasonably cold weather.) The benches are going in, and electrical work will be done next week. Here are a
couple of photos.
The windows are bronze aluminum sliders.
IMG_20201031_132005777 by
Jo Beth E, on Flickr
The framing for the benches is very heavy duty aluminum, which will be covered with mesh, also fans/heater hung from ceiling, and the grid at rear in front of the twinwall is for hanging mounts.
IMG_20201107_124951289 by
Jo Beth E, on Flickr
IMG_20201108_141045867 by
Jo Beth E, on Flickr
Here is the sink that will be set into the solid metal part of the bench for potting.
IMG_20201108_141055785 by
Jo Beth E, on Flickr