Next step... Flooring is laid, sink installed and drainage in place. Shelves hauled up from Batcave. Had to order four more boot trays. When in Batcave, bottom tier just drained onto the floor, so no need for trays on that level.
Facing south...
The south end will have shelving above sink level (not installed yet). The rain barrel came in, to be placed at southwest corner across from sink. It went right back outside when I discovered a big crack on side. Need to get other rain barrel, or repair the one I brought in.
Facing north...
Drain pipe going outside. Pours into a gutter that was already there (kind of like a scupper drain). Please don't notice the miter on molding. I'm trying to teach Bull In A China Shop the finer skills one can attain with a miter saw, but for world peace I had to leave the room during installation.
One of the tray drains, going into drainage pipe. Note that the pipe where it goes outside is at floor level, then note how high it is on south facing wall. Yes, the porch is that unlevel from end to end. One of the pleasures of a porch column setting in a very old house. That's an eight inch drop in 16 feet.
To be updated when I get orchids inside. Should have happened yesterday, but helper "forgot" to show up. I sure get better support and cooperation from friends than I do paying someone... but a necessary evil to avoid burning out friends.